Clean up and restoration work near the new County Road 42 roundabout will resume April 22, 2025, and is expected to last several weeks.

The work will include:

  • Full-depth pavement removal between the new Banwell Road cul-de-sac and Connector Road.
  •  Installation of a barrier curb along the parking lot at County Road 42 and Banwell Road.
  • Removal of the temporary driveway entrance to Tecumseh Vista School and the replacement of the sidewalk and curb in the parking lot area.
  • Replacement of a chain-link fence at Tecumseh Vista School.
  • Other restoration work.

Base asphalt and shouldering is expected to be completed the week of April 28, depending on the weather.

While this work is underway, there may be intermittent road closures and detours around the construction areas. Residents and businesses will continue to have access to their properties. However, they are likely to encounter construction activity, delays and possible short-term disruptions to their driveway access.

County Road 42 reopened in both directions following the completion of the roundabout at the new, realigned intersection of County Road 42 and County Road 43/Banwell Road in Tecumseh in 2024.

An aerial view of the roundabout at County Road 42 and 43.

The big picture

The County of Essex is providing improved reliable infrastructure with the local and regional community in mind. In cooperation with regional municipalities, it is building new roundabouts, and constructing bicycle lanes, sidewalks and multi-use trails along County Road 42 and County Road 43 in Tecumseh and Lakeshore. The reconstruction of County Road 42, between County Road 19 and the City of Windsor, is a multi-year project that will increase road capacity and enhance neighbourhood connectivity.

Phase 1 started in October 2022 was completed in late 2023. It included utility relocation and construction of new storm and sanitary sewers, as well as a watermain. Phase 2, which was substantially completed in 2024, included the construction of a roundabout at the intersection of County Road 42 and County Road 43, The County Road 42 and County Road 43 corridor expansion project is being done in phases - with three more phases to come - and is expected to take five to seven years to complete.

On this page you will find (click on a topic to go to that section):

This video shows the final touches being added to the new roundabout at the County Road 42 and County Road 43 intersection in October 2024, as well as ongoing installation of new water mains and storm sewers along County Road 43:

The project

The County Road 42 reconstruction project follows the recommendations of a class environmental assessment and includes:

  • Widening of County Road 42 from County Road 19 (Manning Road) to the City of Windsor limits to a five-lane roadway with bike lanes, sidewalks and multi-use trails.
  • Multi-lane roundabouts on County Road 42 at County Road 19 (Manning Road) and the new intersection with County Road 43 (Banwell Road).
  • The diversion and widening of County Road 43 from Shields Avenue to south of County Road 42.

 

Map 1 and Map 2 provide an overview of the proposed roadway and how surrounding properties will be affected.

Map 1

An overview map of the project on County Road 42 from the Windsor boundary to east of County Road 43.

Map 2

An overview map of the County Road 42 project from County Road 19 west.

Map 3 provides an overview of the phasing of the project and the tentative timing for each phase. Yellow dots are Phase 1, green is Phase 2, red is Phase 3. purple is Phase 4 and blue is Phase 5.

Map 3

A map of the project with phases labelled.

 

Phase 2 of construction took place around the intersection of County Road 42 and County Road 43 (Banwell Road). Construction took place in 2024. It included the construction of a roundabout at the intersection of County Road 42 and County Road 43,  the realignment of County Road 43 from County Road 42 to the City of Windsor border, work on Tecumseh Concession Road 11, installation of new storm sewers and watermains, and the addition of new multi-use trails.

Phase 2 took place in the area highlighted in green on overview Map 3 above. The map below shows the new roundabout and roadway.

An overview map of Phase 2 of the County Road 42 and County Road 43 reconstruction.

The drawings below show what County Road 43 will look like at street level once the construction is complete.

Adrawing of the cross-section of County Road 43 once completed.
 Photos of construction crews working on Phase 2 in September 2024.

Future phases

County Road 42 will be reconstructed from from County Road 19 (Manning Road) to Lesperance Road. This will include the construction of a roundabout at the intersection of County Road 42 and County Road 19.

Phase 3 will take place in areas highlighted in red on the map.

A map showing the locations of Phase 3 work.

Country Road 42 will be reconstructed from Lesperance Road to County Road 43.

Phase 4 will take place in areas highlighted in purple on the map.

A map of the location of Phase 4 work.

The final phase of this project is the reconstruction of County Road 42 from the County Road 43 roundabout to the boundary of the City of Windsor.

Phase 5 will take place in areas highlighted in blue on the map.

A map showing the locations of Phase 5 work.

What will it look like?

These design drawings of cross sections of County Road 42 show what it will look like when the reconstruction is complete.

A cross section of County Road 42 between the western limit and Concession 11, and Concession 11 and Schiff Drive.
A cross section drawing of County Road 42 between Shiff Drive and St. Alphonse Avenue, and between St. Alphonse and County Road 19.

Updates

Details and background about this project were presented at a public open house in December 2019.

If you have questions or feedback, email Infrastructure and Planning Services at engineering@countyofessex.ca

Construction progress

County and other officials cut the ribbon to open the County Road 42 and County Road 43 roundabout.

October 2024

A ribbon cutting ceremony is held and the County Road 42 roundabout at County Road 43 is opened to traffic.

An aerial view of the County Road 42 roundabout under construction.

September 2024

The roundabout at County Road 42 and County Road 43 starts to take shape.

Construction workers pouring concrete near the County Road 42 roundabout.

September 2024

Concrete curbs and sidewalks is being poured, and base asphalt paving is underway.

A backhoe operator installing a sewer pipe on County Road 43.

August 2024

A new culvert, new sewers and new water mains being installed on County Road 43.

A sign with a roundabout announcing Phase 2 construction on County Road 42

June 2024

Phase 2 construction of a roundabout at the intersection of County Road 42 and County Road 43 commences.

Paving crews on County Road 42 after utilities were moved

August 2023

Phase 1 construction along County Road 42 just west of St. Alphonse Street is nearing completion.

Construction barrels on newly paved shoulders along County Road 42.

January 2023

Phase 1 work is paused for the winter. Temporary widening of the road and addition of asphalt shoulders is complete, as well as underground work.

Phase 1 preparations for the reconstruction of County Road 42

November 2022

Phase 1 underground work from Concession 11 to Pike Creek is underway.

Crews relocating power lines and other utilities along County Road 42.

February 2022

Utility relocation is underway.